spot_img

ذات صلة

الأكثر مشاهدة

A Society Cannot Stand When Half of It Is Accusing the Other Half

Mohammad Khaled Over the past few days, social media has...

Dr. Mudhar Al-Akela to Dimasheq: Measures Underway to Address the Root Causes of the 2011 Non-Compliance Decision

Dimasheq   The Head of the Syrian Atomic Energy Commission, Dr....

Muath Muhareb Explains Reasons for Leaving Al-Ikhbariya: Professional Move, No Truth to Rumors of Restrictions on Freedoms

Dimasheq   Syrian media professional Muath Muhareb explained that his departure...

Minister of Culture and Idlib Governor Attend Funeral of Victims of Sarmada Ammunition Depot Explosion

Dimasheq   Minister of Culture Mohammed Yassin Al-Saleh, accompanied by Idlib...

Culture Minister Honors Idlib Resident for Safeguarding Archaeological Artifacts Since 2014

Dimasheq   Culture Minister Mohammed Yassin Al-Saleh honored Diaa Al-Khanous, a...

Homs Refinery Restarts “Czech Unit” with Annual Capacity of 1.7 Million Tons Following Comprehensive Maintenance

Dimasheq – News

 

The General Company for Homs Refinery has announced the restart of Unit No. 21, known as the “Czech Unit,” after completing extensive maintenance work aimed at improving operational efficiency and increasing the production of petroleum derivatives to meet local market demand.

 

The refinery’s General Director, Khaled Abdul Karim Mohammad Ali, stated that the unit has resumed operations at its designed capacity of approximately 1.7 million tons per year. The maintenance program included overhauling the main and secondary distillation towers, the unit’s furnace, the manufacturing of four heat exchanger bundles and two air-cooler bundles, as well as maintenance of instrumentation and pumps, all carried out by specialized national expertise.

 

He added that the restart of the unit will contribute to increasing the production of several petroleum products, most notably naphtha, kerosene, diesel fuel, and fuel oil, helping to ensure stable supplies and meet local market needs.

 

For his part, Production Director Firas Ali noted that the maintenance work faced challenges due to shortages of certain spare parts. However, reliance on local expertise and technical capabilities enabled the refinery to overcome these obstacles successfully. He also pointed out that the refinery currently operates six active production units.

spot_imgspot_img